How we estimate software projects (and why we publish the model)
Our pricing estimator uses the same model we use internally. Here's how it works, where it's wrong, and how discovery fixes it.

The estimator on our pricing page isn't a lead-generation trick โ it's a simplified version of the spreadsheet we use. Publishing it keeps us honest.
The model
- Platforms carry a base cost: the shell, navigation, auth plumbing, deployment and design system for each surface.
- Features add hours, multiplied when they must work across several platforms.
- Design ambition and product stage scale the total โ an MVP tolerates rough edges that a compliance-heavy v1 can't.
- We show a range, not a number: โ15% to +20% around the central estimate.
Where it's wrong
Integrations with legacy systems, unclear data ownership and regulatory work are the classic sources of surprise. No checkbox captures them, which is why the estimate is a starting point.
How discovery fixes it
A one-week discovery turns the range into a fixed-price scope with milestones. We map integrations, read the docs of every third-party API and write down assumptions. If an assumption breaks later, the scope says what happens.
The point
Clients shouldn't have to guess whether a project costs $15k or $150k before the first call. Try the estimator โ then let's talk about what it can't see.




