Shipping an MVP in six weeks without cutting the wrong corners
Speed comes from deciding what not to build — not from skipping tests. Here's the checklist we use to keep MVPs fast and still production-grade.

Most MVPs are late for the same reason: the team tries to be fast everywhere. The trick is to be ruthless about scope and boring about engineering.
Cut scope, not quality
We write the scope as a list of user outcomes, then mark each one must, should or later. Anything that isn't on the critical path to the first paying user goes to later — admin panels, settings pages, edge-case flows. What stays gets built properly: typed, tested, observable.
Production on day one
The first pull request on every project sets up CI, preview deployments, error tracking and a health check. It takes a day, and it pays back every single week after. You can't move fast on a codebase you're afraid to deploy.
Buy the commodity, build the edge
Auth, payments, email, search and analytics are solved problems. We use managed services for all of them and spend the saved weeks on the one thing that makes the product different.
Demo every Friday
A weekly demo with real data forces small, shippable increments and kills "90% done" forever. If something can't be shown, it isn't done.
Decide in writing
Short RFCs — one page, a problem, two options, a recommendation — make decisions fast and reversible ones obvious. Six weeks later, nobody has to remember why.
Six weeks isn't magic. It's a narrow scope, a production baseline and a cadence that makes progress visible.